What was found
CORROSION ON FRAME SPLICE AT AFT CARGO BAY BS787 RBL25. / [01] EVALUATED CORROSION ON FRAME SPLICE BS 787 RBL 25 WL 159; FOUND TO BE OUT OF LIMITS DUE TO NO LIMITS IN THE SRM AND REQUIRES REPLACEMENT PER SRM 51-10-02-0G-0;[02] VERIFIED EVALUATED CORROSION ON FRAME SPLICE BS 787 RBL 25 WL 159; FOUND TO BE OUT OF LIMITS DUE TO NO LIMITS IN THE SRM AND REQUIRES REPLACEMENT PER SRM 51-10-02-0G-0;[03] REMOVED FRAME SPLICE AT ACB BS 787 RBL 25 WL 159 PER SRM 51-10-02-0G-0;[04] LOCATED AND DRILLED ACB FRAME SPLICE AT BS 787; RBL25; WL159 PER SRM 51-40-05-OG-0 AND DWG 146A1262. OK TO INSTALL;[05] VERIFIED LOCATED AND DRILLED ACB FRAME SPLICE AT BS 787; RBL25; WL159 PER SRM 51-40-05-OG-0 AND DWG 146A1262.<BR>VERIFIED OK TO INSTALL.;[06] INSTALLED ACB FRAME SPLICE AT BS 787; RBL25; WL159 PER SRM 51-40-02-OG-0 AND DWG 146A1262 ID:98;[07] VERIFIED CORRECTIVE ACTION ENTRY 6.;[08] VERIFIED CARD COMPLETE.