Service difficulty report · Rail · Boeing 737

Difficulty date
January 25, 2022
Submitted
April 4, 2022
Operation
Air carrier
Aircraft
N7730A
Make and model
Boeing 737
Aircraft serial
33926
Aircraft time
51,354 hours, 27,779 cycles
Part
Rail
Condition
Corroded
Location
Aft Cargo
Stage of operation
UK
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON RAIL AT AFT CARGO BAY BS767+6 LBL8. MARKED. / [01] EVALUATED CORROSION ON RAIL BS 767+6 LBL 8 WL 156; FOUND 0.020 REMOVED FROM ORIG 0.063 IN 1'X1' AREA; FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2 USING MICROMETER ID 4566A;[02] VERIFIED CORRECTIVE ACTIONS STEP 1.;[03] TRIMMED OUT DAMAGE ON RAIL BS 767+6 LBL 8 WL 156 IAW SRM 53-00-53-2R-2 STEP 4(D);[04] REQUEST HFEC ON TRIM EDGE FOR CRACK FREE CONDITION;[05] VERIFIED DAMAGE REMOVAL PER SRM 53-00-53-2R-2.;[06] VERIFIED APPLICABILITY IAW SRM 53-00-53-2R-2 AND SRM 53-00-53-1A-2;[07] VERIFIED APPLICABILITY OF SRM 53-00-53-2R-2 AND SRM 53-00-53-1A-2;[08] HFEC INSPECTED CUTOUT AREA IAW 737 NDTM PART 6 51-00-00 PROCEDURE 23; NO CRACKS NOTED DURING TIME OF INSPECTION.<BR>EQUIP ID#: IS000450 S/N: N500D000M120071;[09] LOCATED AND DRILLED REPAIR ANGLE; MADE FROM BAC1510-1355#7050-T76511 SI#7530199 IAW SRM 53-00-53-2R-2 OK TO INSTALL;[10] VERIFIED LOCATE AND DRILL OF NEW ANGLE; REQUIRES CHEMICAL CONVERSION AND PRIME OF BARE METAL AREAS; BEFORE OK TO INSTALL; PER SRM 53-00-53-2R-2.;[11] APPLIED A CHEMICAL CONVERSION COATING TO THE BARE SURFACES IAW SRM 51-20-01 AND PRIMED THE BARE SURFACES IAW SOPM 20-41-02;[12] OK TO INSTALL REPAIR ANGLE;[13] VERIFIED CORRECTIVE ACTION 12.<BR>OK TO INSTALL;[14] INSTALLED REPAIR ANGLE ON RAIL AT AFT CARGO BAY BS 767+6 LBL 8 WL 156 IAW SRM 53-00-53-2R-2 AND SRM 51-40-02-0G-0;[15] RII INSPECTION COMPLETE;[16] INSPECTION COMPLETE