What was found
CORROSION ON FLOOR TO SIDEWALL SUPPORT AT AFT CARGO BAY BS727A - BS767 RBL21. / [01] REMOVED CORROSION AFT CARGO BAY ON FLOOR SIDEWALL SUPPORT FROM BS 727A TO 767 ; RBL 21 ; WL 156 ; WORK AREA L 1.0' X W 1.0' X D 0.025' ; ORIGINAL MATERIAL THICKNESS 0.040'; MATERIAL REMAINING 0.015' ; FOUND TO BE OUT OF LIMITS IAW SRM 53-00-53-1A-2; STEP 4A; USING DIAL DEPTH GAUGE ID:ATS400;S/N: UNKNOWN; DUE 08/2022;[03] FABRICATED NEW FLOOR TO SIDEWALL SUPPORT AT ACB BS 727-767 R/H OUT OF BAC1496-377 MATERIAL LOT#1477731-1 PER DWG#146A7502 AND SRM 51-40-05. APPLIED CHEMICAL CONVERSION COATING PER AMM 51-21-41-370-802. REQUEST OK TO APPLY BMS 10-11 PRIMER.;[04] FABRICATED REPLACMENT FLOOR TO SIDEWALL SUPPORT AT ACB BS 727-767 R/H OUT OF BAC1496-377 7075-T6 MATERIAL LOT#1477731-1 PER DWG#146A7502 AND SRM 51-40-05. APPLIED CHEMICAL CONVERSION COATING PER AMM 51-21-41-370-802. REQUEST OK TO APPLY BMS 10-11 PRIMER.;[09] FABRICATED NEW FLOOR TO SIDEWALL SUPPORT AT ACB BS 727-767 R/H OUT OF BAC1496-377 MATERIAL LOT#1477731-1 APPLIED CHEMICAL CONVERSION COATING AND PRIMER IAW AMM 51-21-41-370-802. SOPM 20-41-02 SRM 51-40-02-0G-0; DWG#146A7502 REV A AND SRM 51-40-05.;[10] VERIFIED CORRECTIVE ACTION 9