What was found
CORROSION ON STRINGER AT AREA AFT OF FCB BS536 S-25R WL155. MARKED / ACCOMPLISHED EWIS PROTECTION WITHIN THE REPAIR AREA AT BS BS 536 S-25R WL155 IAW AMM 20-60-07-913-801.;REMOVED CORROSION ON STRINGER AT AREA AFT OF FCB BS 536 S-25R WL155 AREA 3' X 1' X .020' IAW SRM 51-10-02-0G-0. FOUND TO BE OUT OF LIMITS IAW SRM 53-00-03-1A-1 ALLOWABLE DAMAGE 1.;CUT AND REMOVED DAMAGE STRINGER 25R FROM BS 540 TO BS 500D + 10'; WL 155 IAW SRM 51-10-02-0G-0;[04] VERIFIED CORRECTIVE ACTION 1-3; VERIFIED APPLICABILITY SRM 53-00-03-2R-1 REPAIR 1 FUSELAGE STRINGER GENERAL DAMAGE; REPAIRED PER EA 22-153-00367.