Service difficulty report · Support · Boeing 737*

Difficulty date
February 7, 2022
Submitted
March 8, 2022
Operation
Air carrier
Aircraft
N7873A
Make and model
Boeing 737*
Aircraft serial
29350
Aircraft time
48,860 hours, 26,568 cycles
Part
Support
Condition
Corroded
Location
Aft Cargo
Stage of operation
UK
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON AFT CARGO BAY FLOOR TO SIDEWALL SUPPORT AT B.S. 727C+18; 727D+5; 727D+8; 727D+14; 727E+10; 727E+14; 727E+18; 747+6 AND 747+18; R.B.L. 22. / [01] REMOVED CORROSION ON FLOOR TO SIDEWALL SUPPORT AT B.S.727C+18 THE LOWES REMAINING THICKNESS 0.032' MEASURES: L= 2.600' W= 0.900' D= 0.008' ORIGINAL MATERIAL THICKNESS= 0.040' FOUND TO BE OUT OF LIMITS I.A.W. SRM 53-00-53-1A-2 STEP 4 TOOL USED : ID: ATS 1672 S/N 650929 DUE : 03/2022;[02] VERIFIED CORRECTIVE ACTION 1. OUT OF LIMITS.<BR><BR>VERIFIED APPLICABILITY OF SRM 53-00-53-1A-2;[03] FABRICATED FLOOR TO SIDEWALL SUPPORT AT B.S. 727 AT 767 RBL22 FROM BAC1496-377#7075T62 LOT#1477704-1 IAW. SRM 51-40-05-0G-0 DWG NUMBER: 1467502 OK TREAT AND PRIMER;[04] VERIFIED CORRECTIVE ACTION 3.<BR><BR>OK TREAT AND PRIMER;[05] APPLIED ON AFT CARGO BAY FLOOR TO SIDEWALL SUPPORT AT BS727 TO BS767 RBL22 CHEMICAL CONVERSION COATING AND PRIMER IAW SRM 51-20-01 AND SOPM 20-41-02;[06] VERIFIED CORRECTIVE ACTION ENTRY 5.;[07] OK TO INSTALL;[08] OK TO INSTALL;[09] INSTALLED NEW FLOOR TO SIDEWALL SUPPORT FROM BS727 TO BS767 RBL22 WL156 MAT. USED BAC1496-377#7075T62 LOT#1477704-1 IAW. SRM 51-40-02-0G-0 DWG:146A7500;[10] VERIFIED CORRECTIVE ACTION 9;[11] VERIFIED COMPLETE