What was found
AFT CARGO COMPARTMENT;RH Z-CHANNEL FROM STA 727 TO STA 767 HAS CORROSION. / [01] REMOVED CORROSION AT AFT CARGO COMP; RH Z-CHANNEL FROM STA 727 TO STA 767 PER SRM 51-10-02-0G-0.;[02] VERIFIED STEP 1.;[03] PERFORMED UT THICKNESS INSP. ON REWORKED AREA @ AFT CARGO COMPT R/H Z-CHANNEL FROM STA 727 TO STA 767 IAW B737 NDT PART 4 51-00-00 PROC.3. MIN THICKNESS .019'; EQUIP: OLYPMPUS 27MG CAL DUE: 4/22 B/C 172139;[04] EVALUATED DAMAGE AREA AT AFT CARGO COMP R/H Z CHANNEL FROM STA 727 TO STA 767; ORIGINAL MAT 0.040'; MATERIAL REMAINING 0.019'; MAT LOST 0.021'; FOUND TO BE OUT OFT LIMITS; PER REF B737-700 SRM 53-00-53-1A-2.;[05] ADDED MEASUREMENTS TO TABLE.;[06] RECEIVED NEW ZEE CHANNEL R/H SIDE FROM STA 727 TO STA 767 P/N 146A7502-51. INSTALLATION OF ZEE CHANNEL IS ACCOMPLISHED ON CARD TTG8Q004D8NY.;[07] REMOVED CORROSION AT AFT CARGO COMP; RH Z-CHANNEL FROM STA 727 TO STA 767;EVALUATED DAMAGE AREA AT AFT CARGO COMP R/H Z CHANNEL FROM STA 727 TO STA 767; ORIGINAL MAT 0.040'; MATERIAL REMAINING 0.019'; MAT LOST 0.021'; FOUND TO BE OUT OFT LIMITS.RECEIVED NEW ZEE CHANNEL R/H SIDE FROM STA 727 TO STA 767 P/N 146A7502-51. INSTALLATION OF ZEE CHANNEL IS ACCOMPLISHED ON CARD TTG8Q004D8NY. PER REF SRM 51-10-02-0G-0. SRM 53-00-53-1A-2.;[08] VERIFIED STEPS 4;5;6 AND 7.