What was found
(DOT 67-20) AFT CARGO COMPARTMENT FLOOR PANEL 140EF HAS AREAS OF CORROSION ALONG TOP EDGES. / [01] EVALUATED CORRASION DAMAGE FOUND TO BE OUT OF LIMITS IAW <BR>SRM 53-00-53-1A-1 5.A.(1)(B) FIG 102;[02] VERIFIED STEP COMPLETE;[03] VERIFIED MATERIAL IAW<BR>AMM 25-52-01-201-801 1.C.<BR> A-TAG#A115236;[04] VERIFIED STEP 2 IS COMPLETE;[05] VERIFIECATION SHOULD BE FOR STEP 3;[06] VERIFIED ITEMS 1 THROUGH 5;[07] FABRICATED. PANEL 140EF IAW <BR>AMM 25-52-01-201-801 AND <BR>SRM 53-00-53-1A-1 5.A.(1)(B) FIG 102;[08] VERIFIED STEP 7.;[09] OK TO TREAT AND PRIME;[10] ALODINED FLOOR PNL I.A.W MM 51-21-41-370-801;[11] APPLIED PRIMER IAW AMM 51-21-72-370-804.;[12] EVALUATED CORROSION; DAMAGE EXCEEDS 20' OUT OF LIMITS. FABRICATED NEW AFT CARGO COMPARTMENT FLOOR PANEL 140EF - SEE ABOVE FOR COMPLETED WORK.;[13] VERIFIED STEPS 10; 11; AND 12<BR>AUDIT C/W