Service difficulty report · Fitting · Boeing 7378H4

Difficulty date
September 24, 2019
Submitted
May 16, 2022
Operation
Air carrier
Aircraft
N8321D
Make and model
Boeing 7378H4
Aircraft serial
36687
Aircraft time
24,721 hours, 10,813 cycles
Part
Fitting
Condition
Cracked
Location
Rh Pylon
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

#2 ENG. AFT STRUT FAIRING. AFT FITTING IS CRACKED / COMPLIED WITH WORK INSTRUCTION NO. REPAIR-54EA-07244. GENERAL VISUAL INSPECTION MUST BE PERFORMED AT THE END OF CRACK FOR ANY PROGRESSION EVERY 8 DAYS (NOTE PANEL #444BR MUST BE REMOVED TO PERFORM STOP DRILL GVI) PERMANENT REPAIR MUST BE COMPLIED WITH WITHIN 60 DAYS CONSISTING OF REPAIR OR REPLACEMENT OF; CRACKED AFT TRAILING EDGE ASSY (P/N 313A2752-1) OR REPLACEMENT PANEL (P/N313A2752-2) AMT 59828INSP 26613

More about the Boeing 737-8H4