What was found
***CORROSION*** FWD CARGO BAY AFT BULKHEAD TO FLOOR SUPPORT AT STA 500I HAS CORROSION FROM LBL 24 TO RBL 24 WL 156 / REMOVED DAMAGED FLOOR SUPPORT FROM FWD CARGO BAY AFT BULKHEAD STA 500I LBL 24 TO RBL 24 WL 156; DAMAGED CORROSION FOUND OUT OF LIMITS PER S.R.M 53-00-53-1A-2 DAMAGED TABLE 101 PART 4.A DETAIL E VIEW B-B; LOCATED AND DRILLED NEW LOWER RAIL FLOOR SUPPORT PER S.R.M 51-40-02-0G-0 AND INSTALLED PER NEW PER S.R.M 51-40-02-0G-0 PARA 4.B; 7D AND DWG #143A9481 REV-