Service difficulty report · Channel · Boeing 7378H4

Difficulty date
March 2, 2022
Submitted
March 29, 2022
Operation
Air carrier
Aircraft
N8680C
Make and model
Boeing 7378H4
Aircraft serial
36737
Aircraft time
20,604 hours, 9,512 cycles
Part
Channel
Condition
Corroded
Location
Aft Fuselage
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

A22-18; AFT PIT STA 727I+10-827; LBL22; WL157; Z-CHANNEL HAS CORROSION ADJACENT TO 21 EA FASTENER HOLES UPPER AND A COUPLE ON LOWER MRK'D WITH BLACK B. / [01] REMOVED CORROSION ON Z- CHANNEL IAW SRM 51-10-02-0G-0 ITEM 15;[02] EVALUATED ALLOWABLE LIMITS: .040 ORIGINAL 'T'.028 REMAINING .012 LOSS FOUND OUT OF LIMITS IAW SRM 53-00-53-1A-2 TOOL USED UT AAR#36646 DUE 10/06/22;[03] VERIFIED ITEMS 1 AND 2;[04] CUT OUT DAMAGE SECTION OF BETWEEN STA.787-807 AND 727H-727G ;REMOVED IAW SRM 53-00-53-2R-5 REPAIR 5;[05] VERIFIED STEP IS COMPLETE;[06] VERIFIED ITEM 4 AND 5;[07] VERIFIED MATERIAL ID FOR REPAIR PARTS OF Z ANGLE IS BAC1496-377-7075 T6 TAG# A108174 IAW SRM 53-00-53-2R-5 REPAIR 5;[08] VERIFIED STEP 7;[09] FABRICATED Z ANGLE REPAIR PARTS IAW SRM 53-00-53-2R-5 REPAIR 5;[10] VERIFIED STEP 9 AND OK TO TREAT AND PRIME;[11] APPLIED ALODINE AND PRIMER Z ANGLE REPAIR PARTS IAW SRM 51-20-01-0G-0 AND AMM 51-21-72-370-804;[12] VERIFIED STEP 11;[13] OK TO INSTALL;[14] INSTALLED Z ANGLE REPAIR PARTS IAW SRM 53-00-53-2R-5 REPAIR 5;[15] VERIFIED STEP 14;[16] OK TO APPLY CIC;[17] APPLIED CIC REPAIR PARTS IAW AMM 51-21-91-620-802;[18] VERIFIED STEPS 4 AND 17 ARE COMPLETE;[19] VERIFIED ITEM 17 AND 18;[20] AUDIT C/W