Service difficulty report · Intercostal · Boeing 7378H4

Difficulty date
March 3, 2022
Submitted
March 29, 2022
Operation
Air carrier
Aircraft
N8680C
Make and model
Boeing 7378H4
Aircraft serial
36737
Aircraft time
20,604 hours, 9,512 cycles
Part
Intercostal
Condition
Corroded
Location
Aft Fuselage
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

A22-37; AFT PIT STA747-767; RBL22; WL157; INTERCOSTAL HAS CORROSION ON BOTH SURFACES OF UPPER FLANGE / [01] REMOVED DAMAGE INTERCOSTAL IAW SRM 51-40-02-0G-0;[02] VERIFIED STEP 1 IS COMPLETE;[03] EVALUATED ALLOWABLE LIMITS:100% MATERIAL LOSS FOUND OUT OF LIMITS IAW SRM 53-00-53-1A-1;[04] VERIFIED NEW INTERCOSTAL (SPLICE) P/N 146A7505 -12 TAG # WN13933 IAW DWG 146A7502-;[05] RECEIVED FROM BACK SHOP SUPPORT CLIP W/O 43210-1600-0001;[06] VERIFIED STEPS 3 - 5;[07] VERIFIED STEPS 1; 2; 3; 4; 5 AND 6;[08] OK GIVEN TO INSTALL REPAIR PARTS;[09] VERIFIED ALL REPAIR PARTS;[10] LOCATED AND DRILL HOLES ON INTERCOSTAL (SPLICE) AND SUPPORT CLIP IAW SRM 51-40-05-0G-0 AND DWG 146A1310;[11] VERIFIED STEP 10 IS COMPLETE;[12] OK GIVEN TO APPLY PROTECTIVE FINISHES TO REPAIR PARTS;[13] VERIFIED STEPS 10 AND 11 LOCATED AND DRILL HOLES ON INTERCOSTAL (SPLICE) AND SUPPORT CLIP;[14] APPLIED ALODINE AND PRIMER ON SUPPORT CLIP IAW SRM 51-20-01-0G-0 AND AMM 51-21-72-370-804;[15] VERIFIED STEP 14 IS COMPLETE;[16] OK GIVEN TO INSTALL REPAIR PARTS;[17] VERIFIED STEPS 14 AND 15;[18] INSTALLED INTERCOSTAL AND CLIP IAW SRM 51-40-02-0G-0 AND DWG146A7500REV:-;[19] VERIFIED STEP 18 IS COMPLETE;[20] VERIFIED STEPS 18 AND 19;[21] OK GIVEN TO APPLY CIC;[22] APPLIED CIC ON INTERCOSTAL AND CLIP IAW AMM 51-21-91-620-802;[23] VERIFIED JOB IS COMPLETE;[24] VERIFIED STEPS 22-23

More about the Boeing 737-8H4