What was found
CORROSION ON AFT CARGO BAY FLOOR TO SIDEWALL RBL 21 BS 727B+15; 727C+12; BS 727D+5; BS 727D+13; BS 727D+14; BS 727D; BS 727D+8; BS 727E+3; BS 727E+15. / [01] VERIFIED APPLICABILITY FOR ALLOWABLE DAMAGE LIMITS OF AFT CARGO BAY FLOOR TO SIDEWALL SUPPORT RBL 21 IAW SRM53-00-53-1A-2 ALLOWABLE DAMAGE 2;[02] REMOVED CORROSION ON AFT CARGO BAY FLOOR TO SIDEWALL SUPPORT RBL21 BS727B+15;727C+12;BS 727D+5; BS727D+13;BS 727D+14;BS727D;BS727D+8;BS 727E+3;BS 727E+15 IAW SRM 51-10-02 PARAGRAPH 15;BTW BS 727B+15 TO BS727+15;EVALUATED ALL REWORKED AREAS;THE DEPPEST AREA BS 727B+15 RBL21;DIMENSION L=3'X W:1'X DEPTH=0.009;ORIGINAL THICKNESS 0.040' REMAINING THICKNESS 0.031' FOUND TO BE OUT ALLOWABLE DAMAGE LIMITS IAW SRM 53-00-53-1A-2 ALLOWABLE DAMAGE 2 FIG#103 DEATIL'E' TOOL USED;IDATS400 S/N UNKNOWN DUE 08/2022.;[03] UPDATED MEASUREMENTS;[04] VERIFIED CORRECTIVE ACTIONS 1 AND 2.;[05] FABRICATED LOCATED AND DRLLED AFT CARGO BAY NEW FLOOR TO SIDEWALL SUPPORT RBL 21 BS 727 TO BS767 MATERIAL USED BAC1496-377=7075T62 LOT#1477731-1 IAW SRM 51-40-05 AND DWG 146A7502 REV:A;OK APPLY CHEMICAL COATING AND PRIMER.;[06] VERIFIED CORECTIVE ACTION 5.;[07] APPLIED CHEMICAL CONVERSION COATING AND PRIMER AFT CARGO BAY NEW FLOOR TO SIDEWALL SUPPORT RBL 21 BS 727 TO BS767 IAW SRM 51-20-01 AND AMM51-21-72-370-804.;[08] VERIFIED CORRECTIVE ACTION 7.;[09] REPAIR COMPLETE.;[10] VERIFIED CORRECTIVE ACTION 9. NO FURTHER ACTION REQUIRED.<BR><BR>PART TO BE INSTALLED ON TTG8Q004G921.