Service difficulty report · Support · Boeing 7378H4

Difficulty date
March 21, 2022
Submitted
April 18, 2022
Operation
Air carrier
Aircraft
N8624J
Make and model
Boeing 7378H4
Aircraft serial
37004
Aircraft time
27,161 hours, 12,391 cycles
Part
Support
Condition
Corroded
Location
Fwd Cargo
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON FWD CARGO BAY FWD CARGO BAY FLOOR TO SIDEWALL SUPPORT AT RBL 24 BS 400+6; BS 400+10; BS 400+14. / [01] EVALUATED CORROSION AT ALL LOCATIONS; FOUND DEEPEST LOCATION TO BE AT BS 400+10 REMOVED 0.020' IN A AREA OF 1'X1' ORIGINAL THICKNESS 0.040' FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2 USING ATS TOOL ID ATS1225;[02] VERIFIED CORRECTIVE ACTION STEP 1.;[03] REMOVED FWD CARGO BAY FLOOR TO SIDEWALL SUPPORT AT RBL24 BS396 TO BS420; PER SRM 51-40-02-0G-0.;[04] FABRICATED LOCATED AND DRILLED FWD CARGO BAY FLOOR TO SIDEWALL SUPPORT AT RBL24 BS396 TO BS420; PER SRM 51-40-05-0G-0; DWG 143A7500 AND DWG 143A7501; APPLIED CHEMICAL CONVERSION COATING AND PRIMER PER AMM 51-21-41-370-802; AMM 51-21-72-370-804.<BR> MATERIAL USED BAC1496-444#7075T62 LOT 1479718-1.<BR><BR>OK TO INSTALL.;[05] VERIFIED CORRECTIVE ACTION ITEM 3-4; OK TO INSTALL; NUTPLATES REQUIRED BEFORE FINAL COMPLETION..;[06] INSTALLED FWD CARGO BAY FLOOR TO SIDEWALL SUPPORT INCLUDED NEW NUTPLATE AT RBL24 BS396 TO BS420; PER SRM 51-40-02-0G-0; DWG 143A7500 AND DWG 143A7501;[07] VERIFIED CORRECTIVE ACTION STEP 6 COMPLETED;[08] VERIFIED CORRECTIVE ACTION STEP 6 AND 7 COMPLETED

More about the Boeing 737-8H4