What was found
CORROSION ON BS947 UPPER CHORD LBL24 WL 208 / [01] UPDATED STEP 1 FOR APPLICABILITY OF REFERENCE;[02] SRM 53-70-51-1A;[03] STEP 1 COMPLETE;[04] UPDATED STEP 2;[05] STEP 2 COMPLETE;[06] UPDATED STEP 3 AND 4 FOR INTERCOSTAL REMOVAL.;[07] UPDATE OF STEPS 5-17.;[08] STEP 5;17 COMPLETE;[09] UPDATED STEP 18;[10] VERIFIED PARTIAL UPDATE TO STEP 18;[11] UPDATED STEPS 19; 21;22;[12] COMPLETED STEP 23.;[13] UPDATED STEP 24.;[14] VERIFIED ACCOMPLISHMENT OF STEP 24.;[15] UPDATED STEPS 25;26;[16] STEPS 25 AND 26 COMPLETE. T CHORD MACHINED AND DYE PENETRANT INSPECTED;[17] UPDATED STEP 27;[18] VERIFIED STEP 27.;[19] OK TO INSTALL REPAIR PARTS ON STEP 28 ITEMS 1-4;[20] VERIFIED STEP 28. OK TO INSTALL.;[21] VERIFY STEPS 12-15 LOCATED AND DRILLED OK TO INSTALL;[22] VERIFIED WORK STEPS 12-15; OK TO INSTALL PARTS.;[23] INSTALLED REPAIR PARTS ITEM 1(1EA);ITEM 2(4EA);ITEM 3(4EA);ITEM 4(6EA)FABRICATED ON STEP 28 ;ITEM 5 AND 6(2EA )OBTAINED FROM COSTUMER AND LOCATED AND DRILLED ON STEPS 12-15 ALL I.A.W SRM 53-70-51-2R-5 REPAIR 5 PAR 4.L;M.;[24] RII INSPECTED GOOD INSTALLATION OF REPAIR PARTS LISTED IN CORRECTIVE ACTION ITEM 23; MINUS FILLET SEALANT.<BR>PER SRM 53-70-51-2R-5 REPAIR 5 PAR 4;[25] COMPLETED STEP 29. OK TO INSTALL FLOOR SUPPORTS AT BS94