What was found
FORWARD CARGO BAY BAFFLE BETWEEN BS 500G AND 500H WL 154 RBL 25 IS DAMAGED / [01] REMOVED DAMAGED BAY BAFFLE; LOCATED AND DRILLED NEW BAY BAFFLE BTW BS 500G AND 500H WL 154 RBL 25 IAW SRM 51-40-02-0G-0;51-40-05-0G-0 AND DWG 143A7505. OK TO INSTALL.;[02] VERIFIED CORRECTIVE ACTION 1.;[03] INSTALLED NEW BAY BAFFLE P/N 143A7510-22 BTW BS 500G AND 500H WL 154 RBL 25 IAW SRM 51-40-02-0G-0 AND DWG 143A7505.;[04] VERIFIED CORRECTIVE ACTION STEP 3 COMPLETED;[05] VERIFIED CORRECTIVE ACTION STEPS 3 AND 4 COMPLETED