What was found
CORROSION FLOOR STRUCTURE BEAM STA 986.5 AT LBL 42 WL208.1 AT AFT GALLEY AREA 2022-148122 / [01] TOOL USED ULTRASONIC EQUIPMENT PN:45MG; SN: 130063701; DUE DATE: 11-MAY-22;[02] EDDY CURRENT P/N: NORTEC500D; S/N: N500X12101U102020; DUE DATE: 01-JUN-22.;[03] TOOL USED EDDY CURRENT FLAW DETECTOR PN: NORTEC 600D; SN: 2000053402; CAL DUE DATE: 23-APR-22;[04] THE DAMAGE WAS REPAIRED PER 737-700 SRM 53-70-51-2R-6 REPAIR 6 AND EA 22-153-0101;[05] CORRECTED STEP 4 THE DAMAGE WAS REPAIRED PER 737-700 SRM 53-70-51-2R-6 REPAIR 6 AND EA 22-153-0101 SEE INDIVIDUAL SIGNOFFS BELOW;[06] TASK COMPLETED ; RII <BR>SEE INDIVIDUAL SIGNOFFS BELOW