Service difficulty report · Angle · Boeing 7378H4

Difficulty date
March 23, 2022
Submitted
April 26, 2022
Operation
Air carrier
Aircraft
N8625A
Make and model
Boeing 7378H4
Aircraft serial
36896
Aircraft time
27,495 hours, 12,445 cycles
Part
Angle
Condition
Corroded
Location
Fuselage
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON L/H TRANSITION ANGLE STA 747-767 / [01] CORROSION IS OUT OF LIMITS .REMOVED L/H TRANSITION ANGLE FROM STA 727G+10 TO STA 807 +10 FOR REPLACEMENT PER SRM 51-40-02.;[02] LOCATED NEW SECTION FROM STA. 727G + 10 TO STA. 807 + 10 ; AND DRILL HOLES PER SRM 51-40-02 .;[03] VERIFIED LOCATED NEW SECTION FROM STA. 727G + 10 TO STA. 807 + 10 ; AND DRILL HOLES PER SRM 51-40-02 .;[04] INSTALLED BONDED NUTPLATES PER SRM 51-40-10-2R-0;[05] VERIFIED CORRECTIVE ACTION STEP #4;[06] TREATED AND PRIMED ; OK TO INSTALL .;[07] TREATED AND PRIMED PER SRM 51-20-01 . OK TO INSTALL .;[08] VERIFIED TREATED AND PRIMED PER SRM 51-20-01 . OK TO INSTALL .;[09] REMOVED AND REPLACED L/H TRANSITION ANGLE FROM STA 727G+10 TO STA 807 +10 PERSRM 53-00-53;AND SRM 51-40-02.;[10] INSPECTED WORK PERFORMED IN CORRECTIVE ACTION #9. LIEM DANG (TECHNICIAN); 01-APR-2022 00:34 UTC REMOVED AND REPLACED L/H TRANSITION ANGLE FROM STA 727G+10 TO STA 807 +10 PER SRM 53-00-53;AND SRM 51-40-02.;[11] COMPLIED WITH MEASUREMENTS.;[12] REMOVED AND REPLACED L/H TRANSITION ANGLE FROM STA 727G+10 TO STA 807 +10; LBL 21 PER SRM 53-00-53-2R-5.

More about the Boeing 737-8H4