Service difficulty report · Angle · Boeing 7378H4

Difficulty date
March 23, 2022
Submitted
April 26, 2022
Operation
Air carrier
Aircraft
N8625A
Make and model
Boeing 7378H4
Aircraft serial
36896
Aircraft time
27,495 hours, 12,445 cycles
Part
Angle
Condition
Corroded
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON R/H TRANSITION ANGLE STA 727G-727H / [01] CORROSION FOUND TO BE OUT OF LIMITS. REMOVED R/H TRANSITION ANGLE FROM STA 727E+10 TO STA 767 FOR REPLACEMENT PER SRM 51-40-02.;[02] LOCATED HOLES ON NEW TRANSITION ANGLE STA 727E+10 TO 767 PER SRM 51-40-02.;[03] INSPECTED WORK PERFORMED ON C/A #2;[04] ALODINED AND PRIMED NEW TRANSITION ANGLE PER SRM 51-00-53-2R-5 AND SRM 51-20-01.;[05] INSPECTED WORK PERFORMED ON C/A # 4;[06] INSTALLED BONDED NUTPLATES ON NEW TRANSITION ANGLE PER SRM 51-40-10-2R-0.;[07] INSPECTED WORK PERFORMED ON C/A #6;[08] OK TO INSTALL TRANSITION ANGLE;[09] #4 CORRECT SRM REFERENCES: ALODINED AND PRIMED NEW TRANSITION ANGLE PER SRM 53-00-53-2R-5 AND SRM 51-20-01.;[10] COMPLIED WITH MEASUREMENTS.;[11] INSTALLED NEW TRANSITION ANGLE STA 727E+10 TO 767 PER SRM 53-00-53-2R-5 .;[12] INSPECTED WORK PERFORMED ON C/A #9;C/A #10; C/A #11;[13] CERTIFIED;[14] INSPECTED THE FASTNER INSTALLATION R/H TRANSITION ANGLE INBOARD FRAME LOCATIONS FROM STATION 727E TO STATION 767. NO DEFECTS NOTED.;[15] PERFORMED BONDED NUTPLATE PUSH TEST PER SRM 51-40-10-2R-0.;[16] REMOVED AND REPLACED RH TRANSITION ANGLE STA 727E +10 TO STA 767 PER SRM 53-00-53-2R-5.;[17] INSPECTED WORK PERFORMED;[18] INSPECTED WORK PERFORMED

More about the Boeing 737-8H4