Service difficulty report · None · Boeing 737

Difficulty date
April 11, 2022
Submitted
April 26, 2022
Operation
Air carrier
Aircraft
N923WN
Make and model
Boeing 737
Aircraft serial
36627
Aircraft time
46,206 hours, 27,873 cycles
Part
None
Condition
Cracked
Location
Fwd Cargo
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

FWD CARGO COMPARMENT L/H WL 156.4 LBL22 STA 500A Z-CHANNEL CRACKED / [01] CUTOUT DMG SECTION OF THE Z CHANNEL FROM STA 492.5 TO 500D AS PER SRM 51-10-02-0G-0 AND 53-00-53-2R-6 REPAIR 6;[02] REMOVED NUTPLATES IN THE REPAIR AREA AS PER B737-700 SRM 53-00-53-2R-6 REPAIR 6;[03] FABRICATED NEW Z-CHANNEL SECTION FROM STA 492.5 TO 500D AND REPAIR SPLICE AS PER B737-700 SRM 53-00-53-2R-6 REPAIR 6 STEP D AND TABLE 201 PO#1759626;[04] LOCATED AND DRILLED INITIAL Z-CHANNEL; REPAIR SPLICE AND NEW Z-CHANNEL SECTION AS PER B737-700 SRM 53-00-53-2R-6 STEP E THROUGH H; FIG 202 AND SRM 51-40-05-0G-0.;[05] VERIFIED STEPS 1; 2; 3; AND 4. OK TO TREAT AND PRIME;[06] TREATED AND PRIMED REPAIR SPLICE; NEW Z-CHANNEL SECTION AS PER B737-700 AMM 51-21-41-370-803 AND 51-21-72-370-804.;[07] VERIFIED STEP 6; OK TO INSTALL REPAIR PARTS;[08] INSTALLED REPAIR PARTS AS PER B737-700 SRM 51-40-02-0G-0 AND 53-00-53-2R-6 REPAIR 6 FROM STEPS K AND L.;[09] PER SRM 53-00-53-2R-6 STEPS M-O (APPLICATION OF FINISH; CIC AND FLOOR PANEL INSTALLATION) REF. TASK CARD TTG8Q004EWUN.;[10] VERIFIED STEPS 8 AND 9.;[11] C/W;[12] STEPS 8 AND 9 ARE RII