What was found
BS 663 VAPOR BARRIER UPPER ATTACH ANGLE CRACKED AT L.B.L. 12; W.L. 164. REMOVED DAMAGED SECTION OF VAPOR BARRIER UPPER ATTACH ANGLE IAW SRM 57-10-10-2R-5. INSPECTED ALL INITIAL FASTENER HOLES IN THE REPAIR AREA AND TRIMMED EDGE OF DAMAGE CUTOUT NDT PART 6 51-00-00 PROCEDURES 16 AND 23. NO CRACKS FOUND. LOCATED AND DRILLED NEW ATTACH ANGLE AND SPLICE ANGLE IAW SRM 51-40-05-0G-0 & SRM 57-10-10-2R-5. LOCATED & DRILLED THE ATTACH ANGLE AND SPLICE ANGLE IAW SRM 51-40-05-0G-0 & SRM 57-10-10-2R-5 REPAIR 5. APPLIED CHEMICAL CONVERSION COATING & PRIMER ON REPAIR IAW SRM 57-10-10-2R-5, REPAIR 5. INSTALLED REPAIR IAW SRM 57-10-10-2R-5, REPAIR 5. PERFORMED ELECTRICAL RESISTANCE CHECK CHECKED GOOD IAW SWPM 20-20-00 PAR 15.