What was found
RIGHT PACK BAY, HORIZONTAL ANGLE COMMON TO LOWER SIDE OF CENTER FUEL TANK AT BS 663, RBL 10 FOUND CRACKED. REMOVED ALL FASTENERS IN REPAIR AREA IAW SRM 57-10-10-2R-5, FIG 202 SH 6. REMOVED DAMAGE IAW SRM 57-10-10-2R-5 FIG 202 SH 6. HFEC IAW NDT PART 6; 51-00-00 PROC 16. NO DEFECTS NOTED. LOCATED; DRILLED & TRIMMED THE REPLACEMENT ANGLE. LOCATED, DRILLED & TRIMMED SPLICE ANGLE IAW SRM 57-10-10-2R-5 FIG 202 SH 6. TREATED AND PRIMED REPAIR AND CUTOUT IAW SRM 57-10-10-2R-5 STEO 4F-4G. INSTALLED REPAIR IAW SRM 57-10-10-2R-5 STEP 4L(1)-4L(7).