What was found
AFT CARGO BAY R/H FLOOR TO SIDEWALL SUPPORT PLATE HAS AREAS OF CORROSION BS727F TO BS767 RBL21 WL156 / [01] EVALUATED CORROSION AT ALL LOCATIONS; FOUND DEEPEST LOCATION TO BE AT BS 727I+10 RBL 21 WL 156; FOUND 0.015 REMOVED FORM ORIG 0.040 IN NUMEROUS 1'X1' AREAS FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2 USING DIAL DEPTH GAUGE ATS 1225;[02] VERIFIED CORRECTIVE ACTIONS STEP 1.;[03] VALIDATED APPLICABILITY OF SRM 53-00-53-2R-5;[04] REMOVED DAMAGED SECTION; ACB RH FLOOR TO SIDEWALL SUPPORT; BS 727E+10 TO 767. RBL21. FABRICATED REPAIR PARTS FOR RH FLOOR TO SIDEWALL; BS 727E+10 TO 767 RBL21; IAW SRM 53-00-53-2R-5; SRM53-60-53-01-2. APPLIED CHEMICAL CONVERSION COATING; IAW SRM; 51-20-01-0G-0. MATERIAL; BAC1496-377#7075T62; LOT# 1484618-1.;[05] OK TO PRIME REPAIR PARTS.;[06] VERIFIED CORRECTIVE ACTIONS 3-5.<BR><BR>OK TO PRIME REPAIR PARTS.;[07] PRIMED REPAIR PARTS IAW SRM 53-00-53-2R-5 REPAIR 5 PARG 4 (J). OK TO INSTALL;[08] VERIFIED ITEM 7 CORRECTIVE ACTIONS. OK TO INSTALL.;[09] INSTALLED NEW ACB R/H FLOOR TO SIDEWALL SUPPORT PLATE AND SPLICE SIDEPLATE; BS 727E+10 TO BS 767 RBL 21 WL 156 IAW SRM 51-40-02-0G-0; SRM 53-00-53-2R-5 AND DWG 146A7500;[10] VERIFED CORRECTIVE ACTION STEP 9.;[11] COMPLETE.