Service difficulty report · Support · Boeing 7377H4

Difficulty date
April 21, 2022
Submitted
May 5, 2022
Operation
Air carrier
Aircraft
N927WN
Make and model
Boeing 7377H4
Aircraft serial
36889
Aircraft time
45,530 hours, 27,478 cycles
Part
Support
Condition
Corroded
Location
Aft Cargo Bay
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON AFT CARGO BAY FLOOR TO SIDEWALL SUPPORT AT RBL 21 BS 727C+11; BS 727D+5; BS 727D+10; BS 727D+15; BS 727E+2; BS 727E+10; BS 727E+14; BS 727E+17; BS 747+6; BS 747+15. / [01] REMOVED CORROSION ON AFT CARGO TO SIDEWALL SUPPORT AT BS..727C+11;BS ; BS727D+5;BS 727D+10 BS 727D +15; 727E+2 ; BS 727E+10 ; BS727 E+14; BS 727E+17 .AT DISCREPANCY AREA FOUND TO BE OF LIMITS AT BS 727D+15 L=1.5' W=0.500' D=0.016' ORIGINAL THICKNESS 0.040' REMAINING MAT 0.024' MAT LOSS 0.016' IAW SRM 53-00-53-1A-2 FIGU 103 DETAIL (C) USED TOOL ID ATS 1671 DATE 01/2022 DUE 10/2022;[02] CORRECTIVE ACTION 1 ENTRY AN ERROR.REMOVED CORROSION ON AFT CARGO TO SIDEWALL SUPPORT AT BS..727C+11;BS ; BS727D+5;BS 727D+10 BS 727D +15; 727E+2 ; BS 727E+10 ; BS727 E+14; BS 727E+17; BS747+6; BS747+15 AREA FOUND TO BE OF LIMITS AT BS 727D+15 L=1.5' W=0.5' D=0.016' ORIGINAL THICKNESS 0.040' REMAINING MAT 0.024' MAX LOSS 0.016' IAW SRM 53-00-53-1A-2 FIG 103 DETAIL C USED TOOL ID ATS 1671 DATE 01/2022 DUE 10/2022;[03] VERIFIED CORRECTIVE ACTION 2. OUT OF LIMITS;[04] LOCATED AND DRILL NEW FLOOR SIDEWALL SUPPORT ITEM 146A7502-51; LOTE 1485624-1 ON AFT BS.727 FOM 767 RBL 21 IAW SRM 51-40-05-0G-0 AND DWG 147A7500;[05] VERIFIED CORRECTIVE ACTION ITEM 4.;[06] OK TO INSTALL.;[07] OK TO INSTALL GIVEN.;[08] INSTALLED ACB FLOOR TO SIDEWALL SUPPORT FROM BS727+4 - BS767; RBL21; WL157; PER SRM 52-40-02-0G-0 AND BOEING DWG. 146A7500.;[09] VERIFIED CORRECTIVE ACTIONS STEP 8.