What was found
AFT CARGO BAY R/H FLOOR TO SIDEWALL SUPPORT PLATE HAS AREAS OF CORROSION BS727G TO BS787 RBL21 WL156 / [01] EVALUATED CORROSION AT ALL LOCATIONS; FOUND DEEPEST LOCATION TO BE AT BS 747+10 RBL 21 WL 156; FOUND 0.015 REMOVED FROM ORIG 0.040 IN NUMEROUS 1'X1' AREAS; FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2 USING DIAL DEPTH GAUGE ATS 2678 DUE 04/2023;[02] VALIDATED APPLICABILITY OF SRM 53-00-53-2R-5;[03] VERIFIED CORRECTIVE ACTION ENTRY 1-2.;[04] REMOVED ACB FLOOR TO SIDEWALL SUPPORT AT BS 727F+10 - BS767; RBL21; WL156 PER SRM 51-40-02-0G-0;[05] FABRICATED; LOCATED AND APPLIED CHEMICAL CONVERSION COATING TO ACB FLOOR TO SIDEWALL SUPPORT AT BS727F+10 - BS767; RBL21; WL156 AND SPLICE REPAIR AT BS727F+8 - BS 727F+18 USING BAC1496-377#7075T62 LOT#1484618-1 PER SRM 51-40-05-0G AND DWG 146A7500; SRM 53-00-53-2R-5; AMM 51-21-41-370-802.;[06] VERIFIED CORRECTIVE ACTIONS STEP 5.;[07] VERIFIED MEASUREMENTS COMPLETED.;[08] APPLIED PRIMER TO SIDEWALL SUPPORT PER AMM 51-21-72-370-804. OK TO INSTALL;[09] VERIFIED CORRECTIVE ACTION 8. OK TO INSTALL;[10] INSTALLED ACB FLOOR TO SIDEWALL SUPPORT AT BS727F+10 - BS767; RBL21; WL156 AND SPLICE REPAIR AT BS727F+8 - BS 727F+18 PER SRM 53-00-53-2R-5; SRM 51-40-02-0G-0 AND DWG 146A7500;[11] VERIFIED CORRECTIVE ACTION 10;[12] VERIFIED COMPLETE