What was found
AFT CARGO BAY L/H FLOOR TO SIDEWALL SUPPORT PLATE HAS AREAS OF CORROSION BS727G+13 TO BS787+6 LBL21 WL 156 / [01] EVALUATED CORROSION AT ALL LOCATIONS; FOUND DEEPEST LOCATION TO BE AT BS 767+10 LBL 21 WL 156; FOUND 0.015 REMOVED FROM ORIG 0.040 IN NUMEROUS 1'X1' AREAS; FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2 USING DIAL DEPTH GAUGE ATS 2678 DUE 04/2023;[02] VALIDATED APPLICABILITY OF SRM 53-00-53-2R-5;[03] VERIFIED CORRECTIVE ACTION ENTRY 1-2.;[04] REMOVED ACB L/H FLOOR TO SIDEWALL SUPPORT BS 887+13 TO BS 727G+8 PER SRM 53-00-53-2R-5.;[05] CORRECTED STEP 4. TO READ. CUT AND REMOVED ACB L/H FLOOR TO SIDEWALL SUPPORT BS 787+13 TO BS 727G+8; LBL 21; WL 156 PER SRM 53-00-53-2R-5.;[06] LOCATED; DRILLED; AND APPLIED CHEMICAL CONVERSION COATING TO REPAIR ACB L/H FLOOR TO SIDEWALL SUPPORT AND ALL REPAIR PARTS FROM BAC1496-377#7075T62 CLAD; LOT #1484618-1; BS 787+13 TO BS 727G+8; LBL 21; WL 156. PER SRM 53-00-53-2R-5; DWG 146A7500. QTY (2) SPLICES LOCATED AT BS 787+13 AND BS 727G+8.;[07] VERIFIED CORRECTIVE ACTIONS STEP 6.;[08] VERIFIED CORRECTIVE ACTIONS STEP 5.;[09] APPLIED PRIMER TO ACB L/H FLOOR TO SIDEWALL SUPPORT AND ALL REPAIR PARTS BS 787+13 TO BS 727G+8 PER SRM 53-00-53-2R-5. OK TO INSTALL.;[10] VERIFIED CORRECTIVE ACTION 9. OK TO INSTALL;[11] INSTALLED ACB L/H FLOOR TO SIDEWALL SUPPORT AND ALL REPAIR PARTS. BS 727G+8 TO BS 787+13; LBL 21; WL 156. PER SRM 53-00-53-2R-5 AND DWG 146A7500.;[12] VERIFIED CORRECTIVE ACTION 11;[13] VERIFIED COMPLETE