What was found
CORROSION ON AFT CARGO BAY FLOOR TO SIDEWALL SUPPORT AT RBL 21 BS 727F+13; BS 727H+6; BS 727J+10; BS 727J+14; BS 727J+18; BS 747+6; BS 747+14; BS 747+18. /EVALUATED CORROSION AT ALL LOCATIONS; FOUND DEEPEST LOCATION TO BE AT BS 727F+13 REMOVED 0.015' IN A AREA OF 1'X1' ORIGINAL THICKNESS 0.040' FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2 USING ATS TOOL ID ATS2678 EXP 4/2023; VERIFIED CORRECTIVE ACTION STEP 1.; REMOVED DAMAGED FLOOR TO SIDEWALL SUPPORT;LOCATED AND DRILLED NEW FLOOR TO SIDEWALL SUPPORT AT BS 727-767; RBL 21 WL 156 IAW SRM 51-40-02-0G-0;51-40-05-0G-0 AND DWG 146A7500.; INSTALLED NEW FLOOR TO SIDEWALL SUPPORT AT BS 727-767; RBL 21 WL 156 IAW SRM 51-40-02-0G-0 AND DWG 146A7500;146A0061.