What was found
EXTERNAL POWER DOOR CUTOUT AFT SPACER MISSING A SECTION / [01] REMOVED THE INITIAL RUBBING BLOCK & THE LAMINATE SHIM AT AFT MIDDLE CUTOUT OF EGPR; AS PER B737-7 SRM 51-40-02.;[15] INSTALLED REPAIR AT EXTERNAL POWER CUTOUT AFT. AREA PER REF. B-737-7 SRM 53-10-15-2R-4 REPAIR 4;FIG.203.;[16] RE-INSTALLED THE INITIAL RUBBING BLOCK AS PER B737-7 SRM 51-40-02.;[17] LATE ENTRY: SEALANT MIXED TIME: 05/18/22 @ 10:00AM. APPLIED TIME: 10:10AM.;[18] VERIFIED STEP 15;[19] VERIFIED STEP 16 AND 17;[20] APPLIED FINISH TO THE EXT. SURFACE OF THE REPAIR AS PER B737-7 AMM 51-21-73-370-803.;[21] VERIFIED STEP 20