Service difficulty report · Angle · Boeing 7378H4

Difficulty date
May 15, 2022
Submitted
June 13, 2022
Operation
Air carrier
Aircraft
N8690A
Make and model
Boeing 7378H4
Aircraft serial
36916
Aircraft time
20,154 hours, 9,318 cycles
Part
Angle
Condition
Cracked
Location
Rh Pack Bay
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DOT 24-003. RIGHT HAND PACK BAY; HORIZONTAL ANGLE COMMON TO LOWER SIDE OF CENTER FUEL TANK AT STATION 663 RBL 10 IS CRACKED 3RD FASTENER OUTBOARD OF KEEL BEAM VERTICAL ANGLE. / VERIFY REPAIR PARTS FORMED AND HEAT TREATED ON BACKSHOP W/O # 43699-5100-0001 ( -1 REPLACEMENT ANGLE) AND 43699-5100-0002 (-2 SPLICE) IAW SRM 57-10-10-2R-5. BEGAN LOCATING AND DRILLING -1 REPLACEMENT ANGLE AND -2 SPLICE ANGLE IAW SRM 57-10-10-2R-5.;[09] PERFORMED NDT IAW B737 NDT PT. 6; 51-00-00 PROC 16. NO DEFECTS NOTED. TOOL# 40083 CAL DUE 14SEP22.;[10] COMPLETED LOCATING; DRILLING AND FINAL TRIMMING -1 AND -2 REPAIR PARTS IAW SRM 57-10-10-2R-5.;[11] VERIFIED STEP 8 AND 10;[12] VERIFIED STEPS 8; 10 AND 11;[13] OK TO TREAT AND PRIME;[14] HFEC IAW 737 NDT 6; 51-00-00 PROC 16. NO DEFECTS NOTED. TOOL#31823; DUE 23DEC22;[15] TREATED AND PRIMED BARE AREAS OF REPAIR AREA AND REPAIR PARTS IAW SRM 57-10-10-2R-5 STEP 4F-4G.;[16] VERIFIED STEP 15;[17] VERIFIED STEPS 15 & 16;[18] OK TO INSTALL REPAIR PARTS;[19] INSTALLED REPAIR PARTS IAW SRM 57-10-10-2R-5 SECTION 4.L INSTALLED ALL PERMANENT FASTENERS PRIOR TO SQUEEZE OUT; 0870-B2 MIXED AT 1600 ON 5/24/22.;[20] CAP SEALED TANK FASTENERS IAW SRM 57-10-10-2R-5 STEP 4L(8).; APPLIED FILLET SEAL AND CAPSEAL TO REPAIR PARTS IAW SRM 57-10-10-2R-5 SECTION 4.L.BOND CHECK GOOD. ACCOMPLISHED BOND CHECK OF ELECTRICAL BONDING FASTENERS IAW SRM 57-10-10-2R-5 STEP M AND FIG 202 VIEW D USING AAR TOOL # 42387 CAL DUE 07/20/22.

More about the Boeing 737-8H4