What was found
STA 663.5 VAPOR BARRIER LOWER SECTION FOUND STIFFENER CRACKED AT RBL 25'. / [01] STARTED TO REMOVED STIFFENER AT VAPOR BARRIER STA 663.5 RBL 25' AS PER SRM 51-40-02-0G-0.;[02] REMOVED STIFFENER AT VAPOR BARRIER STA 663.5 RBL 25' AS PER SRM 51-40-02-0G-0.;[03] LOCATED AND DRILLED NEW STIFFENER AS PER SRM 51-40-05-0G-0.;[04] VERIFIED 3<BR>OK TO INSTALL;[05] INSTALLED STIFFENER AT STA 663.5 RBL 25 AS PER B737-700 SRM 51-40-02-OG-0 AND DRWG # 111A1000.;[06] VERIFIED AND INSPECTED STEP#5 STIFFENER INSTALLED AT STA 663.5 RBL 25.;[07] OK TO INSTALL CAP SEAL ON FASTENERS.;[08] CAP SEALED FASTENERS AS PER B737-700 SOPM 20-50-19;[09] REMOVED STIFFENER AT VAPOR BARRIER STA 663.5 RBL 25' AS PER SRM 51-40-02-0G-0. LOCATED AND DRILLED NEW STIFFENER AS PER SRM 51-40-05-0G-0. INSTALLED STIFFENER AT STA 663.5 RBL 25 AS PER B737-700 SRM 51-40-02-OG-0 AND DRWG # 111A1000. CAP SEALED FASTENERS AS PER B737-700 SOPM 20-50-19.;[10] VERIFIED AND INSPECTED STEP#8 AND #9 FINAL: REMOVED STIFFENER AT VAPOR BARRIER STA 663.5 RBL 25' AS PER SRM 51-40-02-0G-0. LOCATED AND DRILLED NEW STIFFENER AS PER SRM 51-40-05-0G-0. INSTALLED STIFFENER AT STA 663.5 RBL 25 AS PER B737-700 SRM 51-40-02-OG-0 AND DRWG # 111A1000. CAP SEALED FASTENERS AS PER B737-700 SOPM 20-50-19.