What was found
CRACKED FLOOR SUPPORT STA 540; BL0-RBL 25; WL 208. / [01] REMOVED FLOOR SUPPORT AT STA 540 BL0-RBL25 WL 208 IAW SRM 51-40-02-0G-0.;[02] LOCATED AND DRILLED NEW FLOOR SUPPORT AT STA 540 BL0-RBL25 WL208 IAW SRM 51-40-05-0G-0. OK TO INSTALL.;[03] UPDATED MEASUREMENTS TABLE.;[04] VERIFIED CORRECTIVE ACTION 1-3 AND MEASUREMENT TABLE;[05] INSTALLED NEW FLOOR SUPPORT AT STA 540 BL0-RBL25 WL208 IAW SRM 51-40-02-0G-0.;[06] VERIFIED CORRECTIVE ACTION 5.;[07] JOB IS COMPLETE;[08] VERIFIED WORKSCOPE IS COMPLETE.