Service difficulty report · Angle · Boeing 7378H4

Difficulty date
June 18, 2022
Submitted
July 7, 2022
Operation
Air carrier
Aircraft
N8696E
Make and model
Boeing 7378H4
Aircraft serial
36678
Aircraft time
19,785 hours, 9,324 cycles
Part
Angle
Condition
Corroded
Location
Aft Cargo
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AFT CARGO COMPARTMENT RH TRANSITION ANGLE UPPER SURFACE HAS CORROSION AROUND NUT PLATE HOLES. FROM STA 727H TO STA 727I. / [01] REMOVED R/H TRANSITION ANGLE FROM 727F PLUS 11? TO STATION 767 PER SRM 53-00-53-2R-6. FABBED NEW TRANSITION ANGLE PER SRM 53-00-53-2R-6;[02] INSTALLED RH TRANSITION ANGLE SECTION AND ALL REPAIR PARTS IAW SRM 53-00-53-2R-6. REF STEP 1 FOR PUSH TEST OF CLICK BOND NUT PLATES.;[03] VERIFIED 2. JOSHUA PHIPPS (TECHNICIAN); 24-JUN-2022 08:28 UTC <BR>INSTALLED RH TRANSITION ANGLE SECTION AND ALL REPAIR PARTS IAW SRM 53-00-53-2R-6. REF STEP 1 FOR PUSH TEST OF CLICK BOND NUT PLATES;[04] INSTALLED ADHESIVELY BONDED NUTPLATES ON 23-JUN-09:00 PER SRM 51-40-10.;[05] COMPLETED INSTALLATION PER 53-00-53-2R-6 AND PER ABOVE SIGN OFFS;[06] COMPLETED INSTALLATION PER SRM 53-00-53-2R-6 AND PER ABOVE SIGN OFFS;[07] 6. PEDRO ALBA (TECHNICIAN); 27-JUN-2022 05:39 UTC<BR>COMPLETED INSTALLATION PER SRM 53-00-53-2R-6 . INSPECTED. SEE ABOVE FOR ALL INDIVIDUAL SIGN OFFS.;[08] 6. PEDRO ALBA (TECHNICIAN); 27-JUN-2022 05:39 UTC<BR>COMPLETED INSTALLATION PER SRM 53-00-53-2R-6 . INSPECTED. SEE ABOVE FOR ALL INDIVIDUAL SIGN OFFS. RII;[09] CORRECTED CORROSION LEVEL FROM LEVEL 3 TO LEVEL 2;[10] C/W;[11] R&R TRANSITION ANGLE PER SRM 53-00-53-2R-6

More about the Boeing 737-8H4