Service difficulty report · Channel · Boeing 7377H4

Difficulty date
June 14, 2022
Submitted
July 14, 2022
Operation
Air carrier
Aircraft
N488WN
Make and model
Boeing 7377H4
Aircraft serial
33853
Aircraft time
59,468 hours, 35,169 cycles
Part
Channel
Condition
Corroded
Location
Fuselage
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON PASSENGER CABIN MOP SEAL AT LBL 55 BS 294+10; BS 312+2; BS 312+13; BS 328+4. / [01] VERIFIED SRM 53-10-15-1A-1 ALLOWABLE DAMAGE 1 IS APPLICABLE FOR THIS AIRCRAFT.;[02] REMOVED CORROSION ON PASSENGER CABIN MOP SEAL AT LBL 55 BS 294+10; BS 312+2; BS 312+13; BS 328+4 AREAS 2.5' X 1.3' (4EA) DEEPEST MATERIAL REMOVED .018' IAW SRM 51-10-02-0G-0.ORIGINAL MAT. THICKNESS .090' REMAINING THICKNESS .072'<BR><BR>FOUND TO BE OUT OF LIMITS IAW SRM 53-10-15-1A-1 ALLOWABLE DAMAGE 1 STEP 4.C.(2) FIGURE 108 DETAIL 'D'. IT WILL BE REPAIRABLE BY REPLACEMENT IAW SRM 51-10-02-0G-0 STEP 9.C<BR><BR>TOOL USED ID ATS1671; S/N:65093024; DATE: 01/2023;[03] CERTIFIED ACTION1;[04] VERIFIED CORRECTIVE ACTIONS 1-3;[05] REMOVED FWD ENTRY DOOR MOP SILL IAW SRM 51-40-02-0G-0;[06] LOCATED AND DRILLED NEW FED MOP SILL IAW SRM 51-40-05 AND DWG # 141A8112 ; OK TO INSTALL;[07] VERIFIED CORRECTIVE ACTION #6.<BR>VERIFIED OK TO INSTALL REPAIR PARTS.;[08] INSTALLED NEW MOP SILL PASSENGER CABIN AT BS 270 TO BS 360 IAW SRM 51-40-02-0G-0 AND DWG 141A8110; CARD IS COMPLETED;[09] VERIFIED CORRECTIVE ACTION 8 AND MEASUREMENT TABLE.;[10] WORKSCOPE COMPLETE

More about the Boeing 737-7H4