What was found
AFT CARGO BAY R/H FLOOR TO SIDEWALL SUPPORT PLATE HAS AREAS OF CORROSION BS727F+10 TO BS767; RBL21 WL156 / [01] EVALUATED CORROSION AT ALL LOCATION OF FLOOR TO SIDEWALL SUPPORT; FOUND DEEPEST LOCATION TO BE AT BS 727I+10 RBL 21 WL 156; FOUND 0.015 REMOVED FROM ORIG 0.040 IN NUMEROUS 1'X1' AREAS; FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2 USING DIAL DEPTH GAUGE ATS 2678 DUE 4/2023[04] REMOVED ACB FLOOR TO SIDEWALL SUPPORT AT BS 727E+10 - BS767; RBL21; WL156 PER SRM 51-40-02-0G-0;[05] FABRICATED; LOCATED AND APPLIED CHEMICAL CONVERSION COATING TO ACB FLOOR TO SIDEWALL SUPPORT AT BS727E+10 - BS767; RBL21; WL156 AND SPLICE REPAIR AT BS727E+8 - BS 727E+18 USING BAC1496-377#7075T62 LOT#1490497-1 PER SRM 51-40-05-0G AND DWG 146A7500; SRM 53-00-53-2R-5; AMM 51-21-41-370-802.;[06] FABRICATED; LOCATED AND APPLIED CHEMICAL CONVERSION COATING TO ACB FLOOR TO SIDEWALL SUPPORT AT BS727E+10 - BS767; RBL21; WL156 AND SPLICE REPAIR AT BS727E+8 - BS 727E+18 USING BAC1496-377#7075T62 LOT#1490497-1 PER SRM 51-40-05-0G AND DWG 146A7500; SRM 53-00-53-2R-5 STEP 4 D - I;[11] CONTACTED ENGINEERING FOR INSTALLATION OF REPAIR PARTS AND RECEIVED RESPONSE BACK ON ESR 22-01914; REMOVED AND REPLACED REPAIR PARTS PER 737-800 SRM 51-40-02 AND SPLICE REPAIR PER 737-800 SRM 53-00-53 REPAIR 5 AS SHOWN IN SWA EC/TC 20-153-00933 REV IR;[12] VERIFIED CORRECTIVE ACTION 11;[13] VERIFIED ALL STEPS ACCOMPLISHED