What was found
FLOOR SUPPORT CRACKED BS344+9 LBL 11 WL 208 / [01] UPDATED MEASUREMENTS. REMOVED FLOOR SUPPORT INTERCOSTAL AT BS344+9 LBL11 WL208 IAW SRM 51-40-02.;[02] RECEIVED NEW INTERCOSTAL PO#873188; LOCATED HOLES; DRILLED; AND DEBURRED IAW SRM 51-40-05. ALSO; OK TO INSTALL.;[03] VERIFIED CORRECTIVE ACTION 2.;[04] INSTALLED FLOOR SUPPORT INTERCOSTAL AT BS344+9 LBL11 WL208 IAW SRM 51-40-02 AND BOEING DWG 141A5400.;[05] VERIFIED CORRECTIVE ACTION 4.