Service difficulty report · Support · Boeing 7378H4

Difficulty date
July 1, 2022
Submitted
July 25, 2022
Operation
Air carrier
Aircraft
N8641B
Make and model
Boeing 7378H4
Aircraft serial
60085
Aircraft time
27,233 hours, 12,566 cycles
Part
Support
Condition
Corroded
Location
Fwd Cargo
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON FWD CARGO BAY L/H FLOOR TO SIDEWALL SUPPORT FROM STA 440+5 TO STA 500H+17 ; LBL 24; WL 156. / [01] EVALUATED CORROSION AT ALL LOCATIONS; FOUND DEEPEST LOCATION TO BE AT BS 500E+14 REMOVED 0.015' IN A AREA OF 1'X1' ORIGINAL THICKNESS 0.040' FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2 USING ATS TOOL ID ATS2678 EXP 4/2023;[02] VERIFIED CORRECTIVE ACTION #1;[03] REMOVED FLOOR TO SIDEWALL SUPPORT L/H BS 500I - 500A LBL25 WL156 IAW SRM 51-40-02-0G-0;[04] REMOVED FWD BKD SUPPORT CENTER ANGLE BS 400 LBL24-RBL24 WL156 IAW SRM 51-40-02-0G-0 FOR ACCESS.;[05] REMOVED FLOOR TO SIDEWALL SUPPORT L/H BS 500I - 396 LBL25 WL156 IAW SRM 51-40-02-0G-0.;[06] LOCATED AND DRILLED NEW FLOR TO SIDEWALL SUPPORT L/H P/N 143A7501U187 BS 500I - 396 LBL25 WL156 IAW SRM 51-40-05-0G-0.;[07] VERIFIED CORRECTIVE ACTIONS STEP 6.;[08] OK TO INSTALL FLOOR TO SIDEWALL SUPPORT L/H BS 500I - 396 LBL25 WL156 AND FWD BKD SUPPORT CENTER ANGLE BS 400 LBL24-RBL24 WL156 .;[09] VERIFIED CORRECTIVE ACTION 8; OK TO INSTALL GIVEN;[10] VERIFIED ALL MEASUREMENT SECTION EXCEPT #22 STILL REQUIRED TO BE COMPLETED;[11] INSTALLED NEW FLOOR TO SIDEWALL SUPPORT L/H P/N 143A7501U187 BS 500I - 396 LBL25 WL156 AND FWD BKD SUPPORT CENTER ANGLE BS 400 LBL24-RBL24 IAW SRM 51-40-02-0G-0 AND DWG 143A7500.;[12] VERIFIED CORRECTIVE ACTION 11; VERIFIED MEASUREMENT TABLE COMPLETED

More about the Boeing 737-8H4