Service difficulty report · Support · Boeing 7378H4

Difficulty date
July 1, 2022
Submitted
July 25, 2022
Operation
Air carrier
Aircraft
N8641B
Make and model
Boeing 7378H4
Aircraft serial
60085
Aircraft time
27,233 hours, 12,566 cycles
Part
Support
Condition
Corroded
Location
Fwd Cargo
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON FWD CARGO BAY R/H FLOOR TO SIDEWALL SUPPORT FROM STA 500A TO STA 500H+19; RBL 25 TO RBL 23; WL 156. / [01] EVALUATED CORROSION AT ALL LOCATIONS; FOUND DEEPEST LOCATION TO BE AT BS 500F+11' REMOVED 0.015' IN A AREA OF 1'X1' ORIGINAL THICKNESS 0.045' FOUND TO BE OUT OF LIMITS PER SRM 53-30-15-1A-1 USING ATS TOOL ID ATS2678 EXP 4/2023;[02] VERIFIED CORRECTIVE ACTION #1;[03] REMOVED FLOOR TO SIDEWALL SUPPORT R/H BS 500I - 400 RBL25 WL156 IAW SRM 51-40-02-0G-0;[04] FABRICATED FWD CARGO BAY R/H FLOOR TO SIDEWALL SUPPORT PLATE FROM BS 500A TO BS 500I RBL 23 WL 156; MADE FROM BAC1496-444#7075T62; LOT#1490548-1 WITH A SPLICE AT BS 500D+12 IAW SRM 53-00-53-2R-5 REPAIR 5;[05] FABRICATED 2 (EACH) TAPERED FILLERS FROM 0.040' THICK 7075-T6 CLAD AND SPLICE SIDEPLATE; MADE FROM BAC1496-444#7075T62; LOT#1490548-1 IAW SRM 53-00-53-2R-5 REPAIR 5;[06] APPLIED A CHEMICAL CONVERSION COATING TO ALL REPAIR PARTS IAW SRM 51-20-01; OK TO PRIME;[07] FABRICATED ALL REPAIR PARTS PENDING ENGINEERING FOR ITEMS 4 AND 5;[08] VERIFIED CORRECTIVE ACTION ITEM 3-7; PENDING ENGINEERING.;[09] APPLIED PRIMER TO ALL REPAIR PARTS IAW SOPM 20-41-02; OK TO INSTALL;[10] VERIFIED CORRECTIVE ACTION 9 (PRIMER APPLICATION); OK TO INSTALL PENDING ENGINEERING APPROVAL;[11] INSTALLED FWD CARGO BAY R/H FLOOR TO SIDEWALL SUPPORT PLATE BS 500A TO BS 500I RBL 23 WL 156 WITH SPLICE PLATE AT BS 500D + 12 IAW SRM 53-00-53-2R-5 REPAIR 5 AND SRM 51-40-02-0G-0; PENDING ENGINEERING

More about the Boeing 737-8H4