Service difficulty report · Floor Support · Boeing 7377H4

Difficulty date
June 24, 2022
Submitted
July 28, 2022
Operation
Air carrier
Aircraft
N485WN
Make and model
Boeing 7377H4
Aircraft serial
32473
Aircraft time
60,155 hours, 35,804 cycles
Part
Floor Support
Condition
Corroded
Location
Fwd Fuselage
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

*CORROSION* FWD CABIN FLOOR SUPPORT BEAM STA 344 HAS CORROSION AROUND HI-LOCK FASTENER AT BL 0 AND AROUND FASTENER HOLE AT LBL 9. 124-016 / [01] REMOVED CORROSION FROM FWD CABIN FLOOR SUPPORT BEAM STA 344 AROUND HI-LOCK FASTENER AND FASTENER HOLE LBL 9. PER SRM 51-10-02-0G-0.;[02] REWORKED SURFACE TO A MINIMUM OF 125 MICROINCHES SMOOTH. PER SRM 51-10-02-0G. TOOL USED: B/C 172331 NO CAL DATE.;[03] VERIFIED STEPS 1 AND 2;[04] ACCOMPLISHED A VISUAL INSPECTION WITH A 10 POWER MAGNIFYING GLASS OF THE REWORKED AREA. NO CORROSION OR VISIBLE CRACKS NOTED. REF SRM 51-10-02-0G-0 STEP 15 A. (6) (A);[05] MEASURED LIMITS OF REWORKED AREA AT BL 0; ORIGINAL THICKNESS: .175'; MATERIAL REMOVED: .035'; MATERIAL REMAINING: .140'. AREA AT LBL 9; ORIGINAL THICKNESS: .175'; MATERIAL REMOVED: .055; MATERIAL REMAINING: .120'. REWORKED AREA FOUND OUT OF LIMITS PER SRM 53-10-51-1A-1 FIG 105 DETAIL A. TOOLS USED B/C 211105 CAL DUE: 03/25/2023.;[06] FABRICATED ANGLE REPAIR 30''X2.5''X1'' MATERIAL USED 7075-0 IAW B737-700 EA #22-153-01982-WIP1;[15] INSTALLED FLOOR PANEL 221EF AT AT MAIN CABIN AS PER B737-700 AMM 53-21-00-400-801;[16] REPAIR ACCOMPLISHED PER EA-22-153-01982;[17] C/W

More about the Boeing 737-7H4