Service difficulty report · Angle · Boeing 7377H4

Difficulty date
July 13, 2022
Submitted
July 29, 2022
Operation
Air carrier
Aircraft
N961WN
Make and model
Boeing 7377H4
Aircraft serial
36962
Aircraft time
35,652 hours, 21,682 cycles
Part
Angle
Condition
Cracked
Location
Center Wing
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DOT#04-186 LH A/C BAY STA 663 UPPER AFT ANGLE CRACKED AT FASTANER LBL 9 WL 172 / [01] REMOVED DAMAGED SECTION PER B737 SRM 57-10-10-2R-5;[02] RECEIVED -1 REPLACEMENT ANGLE FROM BACKSHOP ON WORK ORDER 43976-000-0001 AND -2 SPLICE ANGLE ON WORK ORDER 43976-000-0002;[03] VERIFIED STEPS 1-2;[04] ACCOMPLISHED OPEN HOLE HFEC CRACK CHECK IAW B737 NDT P6 51-00-00 P16 <BR><BR>ACCOMPLISHED SURFACE HFEC OF CUT LINE IAW B737 NDT P6 51-00-00 P23 <BR><BR>TOOL 36303 DUE 13APR23<BR><BR>NO CRACKS NOTED;[05] LOCATED; DRILLED AND FABRICATED -1 REPLACEMENT ANGLE AND -2 SPLICE ANGLE PER B737 SRM 57-10-10-2R-5;[06] VERIFIED STEP 5. OK TO TREAT AND PRIME;[07] TREATED AND PRIMED REPAIR PARTS AND CUT EDGE PER B737 SRM 57-10-10-2R-5;[08] VERIFIED STEP 7;[09] OK TO INSTALL;[10] COMPLETED INSTALLATION OF REPAIR ANGLE AND APPLIED INTERNAL CAP SEALANT IAW SRM 57-10-10-2R-5;[11] VERIFIED STEP 10;[12] APPLIED EXTERNAL CAP SEAL AND FILET SEAL TO REPAIR PARTS; APPLIED CIC TO REPAIR AREA PER B737 SRM 57-10-10-2R-5.;[13] VERIFIED STEP 12;[14] VERIFIED NO LEAKS THRU TANK FASTENERS PER B737 AMM 28-11-00-790-801;[15] VERIFIED ITEM 14;[16] AUDIT C/W

More about the Boeing 737-7H4