What was found
CORROSION FLOOR STRUCTURE BEAM LOCATED BS986.5 AT LBL43 AND WL208.1 AT AFT GALLEY AREA 2022-355106 / [01] TOOL USED ULTRASONIC GAGE P/N: 45MG; S/N: 130061901; DUE DATE: 08-APR-23.;[02] TOOL USED: EDDY CURRENT FLAW DETECTOR; P/N: NORTEC 600 D; S/N: 190023010; DUE DATE: 14-FEB-23.;[03] TOOL USED: EDDY CURRENT FLAW DETECTOR; P/N: NORTEC 600 D; S/N: 190023010; DUE DATE: 14-FEB-23.;[04] INSPECTION REJECT IN STEP 11<BR>SEE TTG8Q00DHR4N;[05] ITEM 4 COMPLETED; REJECTION DOCUMENTED ON STEP 11 RESOLVED; RII <BR><BR>SEE TASK TTG8Q00DHR4N;[06] REPAIRED FLOOR STRUCTURE BEAM LOCATED BS986.5 LBL43 AND WL208.1 AT AFT GALLEY AREA IAW B737-700 SRM 53-70-51-2R-6 REPAIR 6 ALTERNATIVE 3 FIGURE 204 SEE INDIVIDUAL SIGN-OFFS BELOW.;[07] CORRECTED STEP 6. REPAIRED FLOOR STRUCTURE BEAM LOCATED BS986.5 LBL43 AND WL208.1 AT AFT GALLEY AREA IAW B737-700 SRM 53-70-51-2R-6 REPAIR 6 ALTERNATIVE 4 FIGURE 205. SEE INDIVIDUAL SIGN-OFFS BELOW.;[08] REPAIRED FLOOR STRUCTURE BEAM LOCATED BS986.5 LBL43 AND WL208.1 AT AFT GALLEY AREA IAW B737-700 SRM 53-70-51-2R-6 REPAIR 6 ALTERNATIVE 4 FIGURE 205. SEE INDIVIDUAL SIGN-OFFS BELOW. COMPLETED AS RII Ï¿½TEM