Service difficulty report · Support · Boeing 7378H4

Difficulty date
July 19, 2022
Submitted
August 8, 2022
Operation
Air carrier
Aircraft
N8642E
Make and model
Boeing 7378H4
Aircraft serial
42525
Aircraft time
27,092 hours, 12,498 cycles
Part
Support
Condition
Corroded
Location
Aft Cargo
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AFT CARGO BAY L/H FLOOR TO SIDEWALL SUPPORT PLATE HAS AREAS OF CORROSION BS747 TO BS847 LBL21 WL156 / [01] EVALUATED CORROSION AT ALL LOCATIONS ON FLOOR TO SIDEWALL SUPPORT; FOUND DEEPEST LOCATION TO BE AT BS 747+10 LBL 21 WL 21; FOUND 0.015 REMOVED FROM ORIG 0.040 IN NUMEROUS 1'X1' AREAS; FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2 USING DIAL DEPTH GAUGE ATD 2678 DUE 04/2023;[02] CORRECTION TO STEP 1; WL IS 156;[03] VERIFIED ACTION #1;2;[04] VALIDATED APPLICABILITY OF SRM 53-00-53-2R-5;[05] REMOVED DAMAGED PART OF THE ACB L/H FLOOR TO SIDEWALL SUPPORT BS727J+10 TO BS847; LBL21; WL156. PER SRM 53-00-53-2R-5 STEP 4. B & C.;[06] FABRICATED ACB L/H FLOOR TO SIDEWALL SUPPORT AND ALL REPAIR PARTS BS727J+10 TO BS847; LBL21; WL156. PER DWG 146A7500 AND SRM 53-00-53-2R-5 STEPS 4. D. THRU H. FROM BAC1496-377#7075T62 EXT. CLAD LOT#1494598-1. SLICE LOCATION BS727J+10.;[07] VERIFIED CORRECTIVE ACTION #5; 6<BR>VERIFIED MEASUREMENTS;[08] APPLIED CHEMICAL CONVERSION COATING AND PRIMER TO ACB FABRICATED L/H FLOOR TO SIDEWALL SUPPORT AND ALL REPAIR PARTS PER SRM 53-00-53-2R-5 STEP 4. I. AND J. OK TO INSTALL.;[09] VERIFIED CORRECTIVE ACTION #8;[10] INSTALLED FABRICATED ACB L/H FLOOR TO SIDEWALL SUPPORT AND ALL REPAIR PARTS BS727J+10 TO BS847; LBL21; WL156. PER DWG 146A7500 AND SRM 53-00-53-2R-5 STEPS 4. K THRU N.;[11] VERIFIED CORRECTIVE ACTION #10