What was found
CORROSION ON FLOOR SUPPORT STA 949; LBL 25; WL 208; UPPER SURFACE. / [01] NO LIMITS FOUND ON SRM FOR SPECIFIC DAMAGE SRM 51-10-02-0G-0 PAR 9.C REPLACEMENT OF THE PART IS APPLICABLE;[02] VERIFIED CORRECTIVE ACTION #1 AND MEASUREMENT FIELD;[03] REMOVED FLOOR SUPPORT BS947-BS967 LBL25 WL208 I.A.W SRM 51-40-02-0G-0.;[04] LOCATED AND DRILLED NEW FLOOR SUPPORT BS947-BS967 LBL25 WL208 I.A.W SRM 51-40-05-0G-0 AND BOEING DWG 147A5650. OK TO INSTALL;[05] VERIFIED CORRECTIVE ACTION 4. OK TO INSTALL FLOOR SUPPORT.;[06] INSTALLED NEW FLOOR SUPPORT BS 947-967 LBL25 WL 208 PER SRM 51-40-02-0G-0;[07] CORRECTED STEP 1;[08] CERTIFIED CORRECTION;[09] VERIFIED CORRECTIVE ACTION #6 AND STEP 1;[10] VERIFIED CORRECTIVE ACTION #6 AND STEP 1