What was found
CRACK ON LOWER L/H COMPOSITE BULKHEAD AT LBL 35 BS 663. / [01] IDENTIFIED PANEL IAW SRM 57-10-10-0I-2 FIGURE 2 ITEM [4] AND TABLE 2 ITEM [4]. DAMAGE IS BEYOND ALLOWABLE LIMITS IAW SRM 57-10-10-1A-2 PARAGRAPH 4.D.(1).(A) AND WILL BE REPAIRED IAW SRM 51-70-04-2R-10 PER SRM 57-10-10-2R-2 PARAGRAPH 1.C. REMOVED EXTENSIVE CRACK DAMAGE FROM A 28'X18' AREA LOCATED MIDSPAN OF THE PANEL AND PREPPED AREA FOR REPAIR; WORK ACCOMPLISHED IAW SRM 51-70-04-2R-10 PARAGRAPH 4.A-C.;04] FABRICATED REPAIR PLIES FROM BMS9-3 STYLE 1581 LOT NUMBER 1493221-1 IAW SRM 51-70-04-2R-10 PARAGRAPH 4.D; OK TO INSTALL REPAIR PLIES.;[05] INSPECTED AND VERIFIED CORRECTIVE ACTION 4. KAY TO INSTALL REPAIR PLIES PER SRM 51-70-04-2R-10.;[06] INSTALLED REPAIR PLIES USING BMS 8-301 CL1 GR1 LOT#JH2EAA8896;