What was found
RH STA 663 VAPOR BARRIER CRACKED AT RBL 25. / [01] MEASUREMENTS;[02] CLEANED R/H VAPOR BARRIER ;PREPARED DAMAGE AREA FOR REPAIR; STOP DRILL ALL CRACKS AS PER B737 SRM 51-70-04-2R-10;[03] PERFORMED DRY OUT ON VAPOR BARRIER; FOUND NO WATER AS PER B737 SRM 51-70-04-2R-10;[04] VERIFIED STEPS 1 ;2 & 3 AND OK TO INSTALL REPAIR;[05] REPAIRED CRACK DAMAGE ON R/H VAPOR BARRIER WITH A PERMANENT REPAIR AS PER B737 SRM 51-70-04-2R-10;[06] PERFORMED TAP TEST ON REPAIRED AREA ;FOUND NO DELAMINATION AS PER B737 NDT 51-05-01 SECTION 5;[07] VERIFIED STEPS #5 AND #6.;[08] OK TO APPLY PRIMER AND TOP COAT.;[09] APPLIED TREAT AND PRIMER AT VAPOR BARRIER REPAIR AS PER REF B737-700 AMM 51-21-73-370-803;[10] APPLIED TOP COAT AT VAPOR BARRIER REPAIR AS PER REF B737-700 AMM 51-21-73-370-803;[11] VERIFIED STEPS 9 AND 10.