What was found
RH O/B AFT FLAP HAS DELAM AREA 21 X 10 LOWER SURFACE; INBD CORNER. / [01] REMOVED R/H O/B AFT FLAP;[02] RII INSPECTED AS REQUIRED. OK TO INSTALL NEW FLAP;[03] INSTALLED NEW R/H O/B AFT FLAP PER AMM 27-51-22.;[04] RII INSPECTED AS REQUIRED. CORRECTIVE ACTION #3;[05] REMOVED AND REPLACED R/H O/B AFT FLAP.ACCOMPLISHED ADJUSTMENT/OPS CHECK PER A.M.M. 27-51-22.OPS CHECKED #7 AND #8 CANOE FAIRINGS PER A.M.M. 27-51-28.(SEE JOB STOPS AND STEPS FOR INDIVIDUAL SIGN OFF?S.);[06] VERIFIED ANTHONY NACINOVICH (TECHNICIAN); 05-AUG-2022 03:59 UTC<BR>REMOVED AND REPLACED R/H O/B AFT FLAP. ACCOMPLISHED ADJUSTMENT/OPS CHECK PER A.M.M. 27-51-22.OPS CHECKED #7 AND #8 CANOE FAIRINGS PER A.M.M. 27-51-28.(SEE JOB STOPS AND STEPS FOR INDIVIDUAL SIGN OFF?S.) C/W