What was found
LH BS 663 VAPOR BARRIER DOUBLER LBL 6 TO LBL 30 IS CRACKED / [01] FABRICATED DOUBLER ON CUSTOMER RO NO 874526-SWA. LOCATED AND DRILLED IAW SRM 51-40-05-0G-0. REQ OK TO TREAT AND PRIME;[02] VERIFIED CORRECTVE ACTION 1.<BR>OK TO TREAT AND PRIME;[03] VERUFIED APPLICABILITY: NOT FOUND ALLOWABLE DAMAGE FOR DOUBLER ON SRM; REPAIR BY REPLACEMENT PART IAW SRM 51-10-02-0G-0 PARA. 9;[04] APPLIED CHEMICAL CONVERSION AND PRIME IAW SOPM 20-40-03 AND SRM 51-20-01-0G-0;[05] VERIFIED CORRECTIVE ACTION 3 AND 4