Service difficulty report · Support · Boeing 7378H4

Difficulty date
July 29, 2022
Submitted
August 12, 2022
Operation
Air carrier
Aircraft
N8697C
Make and model
Boeing 7378H4
Aircraft serial
36728
Aircraft time
19,916 hours, 9,391 cycles
Part
Support
Condition
Corroded
Location
Aft Cargo
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AFT CARGO BAY R/H FLOOR TO SIDEWALL SUPPORT PLATE HAS AREAS OF CORROSION BS727F TO BS767 RBL21 WL156 / [01] EVALUATED CORROSION AT ALL LOCATIONS OF FLOOR TO SIDEWALL SUPPORT; FOUND DEEPEST LOCATION TO BE AT BS 727I +10 RBL 21 WL 156; FOUND 0.015 REMOVED FROM ORIG 0.040 IN NUMEROUS 1'X1' AREAS; FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2 USING DIAL DEPTH GAUGE ATS 2678 DUE 04/2023;[02] VERIFIED ACTION #1;[03] VALIDATED APPLICABILITY OF SRM 53-00-53-2R-5;[04] REMOVED ACB FLOOR TO SIDEWALL SUPPORT AT BS 727E + 10 - BS767; RBL21; WL156 PER SRM 53-00-53-2R-5 STEP 4.B. SRM 51-40-02-0G-0;[05] FABRICATED; LOCATED AND APPLIED CHEMICAL CONVERSION COATING TO ACB FLOOR TO SIDEWALL SUPPORT AT BS727E+10' - BS767; RBL21; WL156 AND SPLICE REPAIR AT BS727E+8' - BS727E+18' USING BAC1496-77#7075T62 LOT # 1477731-1 PER SRM 51-40-05-0G AND DWG 146A7500; SRM 53-00-53-2R-5 STEP 4. I. AMM 51-21-41-370-802;[06] CORRECTION TO STEP 5; MATERIAL USED IS BAC1496-377#7075T62;[07] VERIFIED CORRECTIVE ACTION #4-6; OK TO PRIME;[08] APPLIED PRIMER TO ACB FLOOR TO SIDEWALL SUPPORT PER SRM 53-00-53-2R-5 STEP 4. J.;[09] OK TO INSTALL REPAIR PARTS.;[10] VERIFIED CORRECTIVE ACTION #9 OK TO INSTALL;[11] INSTALLED NEW ACB FLOOR TO SIDEWALL SUPPORT AT BS727E+10' - BS767; RBL21; WL156 AND SPLICE REPAIR AT BS727E+8' - BS727E+18' PER SRM 53-00-53-2R-5 AND DWG 146A7500;;[12] VERIFIED CORRECTIVE ACTION #11 AND MEASUREMENT FIELD;[13] VERIFIED CORRECTIVE ACTION #11 AND MEASUREMENT FIELD

More about the Boeing 737-8H4