What was found
CABIN; STA.947.5 LBL 25; HARD POINT FITTING ON FLOORBEAM HAS AREA OF CORROSION. / [01] REMOVED CORROSION ON FLOORBEAM AT STA. 947.5 LBL 25; REMOVED .055? OF .185? FOUND TO BE OUT OF LIMITS PER SRM 53-70-51-1A-1.;[02] VERIFIED CORROSION REMOVAL IS OUT OF LIMITS.;[03] FABRICATED SHIM IAW SRM 53-70-51-2R-8; ALT. 3. TREATED AND PRIMED SHIM AND BARE AREAS OF 947.5 FLOORBEAM IAW SRM 51-20-01 AND SOPM 20-41-02.;[04] VERIFIED CA #3. RICHARD BLACKBURN (TECHNICIAN); 22-JUL-2022 05:21 UTC<BR>FABRICATED SHIM IAW SRM 53-70-51-2R-8; ALT. 3. TREATED AND PRIMED SHIM AND BARE AREAS OF 947.5 FLOORBEAM IAW SRM 51-20-01 AND SOPM 20-41-02. C/W;[05] OK TO INSTALL REPAIR PARTS;[06] INSTALLED REPAIR PARTS AND HARDPOINT FITTING IAW EA 22-153-02143 AND SRM 53-70-51-2R-8; ALTERNATE 3.;[07] INSPECTED WORK ABOVE;[08] OK TO CIC THE OPENED AREA.;[09] APPLIED CIC TO REPAIR AREA AND DISTURBED AREAS IAW AMM 51-00-59.;[10] INSPECTED THE WORK PERFORMED ON STEP 4; NO DEFECTS NOTED.;[11] INSPECTED THE WORK PERFORMED ON STEP 3; NO DEFECTS NOTED.;[12] VERIFIED ALL STEPS COMPLETED AND SIGNED OFF.