Service difficulty report · Support · Boeing 7377H4

Difficulty date
July 5, 2022
Submitted
August 19, 2022
Operation
Air carrier
Aircraft
N202WN
Make and model
Boeing 7377H4
Aircraft serial
33999
Aircraft time
58,974 hours, 35,001 cycles
Part
Support
Condition
Corroded
Location
Fwd Cargo Bay
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON AFT CARGO BAY AFT R/H LOWER BULKHEAD SUPPORT AT BS 947 RBL 22. / [01] EVALUATED DAMAGE: NO SRM LIMITS FOR THIS PART REPAIR BY REPLACEMENT IAW SRM 51-10-02 PARA # 9.;[02] REMOVED ON AFT CARGO BAY AFT R/H LOWER BULKHEAD SUPPORT AT BS 947 RBL 22 IAW SRM 51-40-02;[03] LOCATED AND DRILLED ON AFT CARGO BAY AFT R/H LOWER BULKHEAD SUPPORT AT BS 947 RBL 22.ITEM :149A8118-27 LOT#1497077-1 PO#875205/1 IAW SRM 51-40-02 AND DWG 149A8118 REV:B.;[04] MADE COUNTERSINK IAW SRM 51-40-08/0G1. REQUEST OK TO INSTALL;[05] COUNTERSUNK R/H BS 947 BULKHEAD SUPPORT IAW SRM 51-40-08/0G1. REQUEST OK TO INSTALL;[06] VERIFIED CORRECTIVE ACTIONS STEP 3;4. OK TO INSTALL GIVEN.;[07] BEGAN INSTALLING R/H LOWER BULKHEAD SUPPORT AT BS 947 IAW SRM 51-40-02; DWG 149A8110 ID:0008 REV: A AND 149A8117 ID: 0006 REV: -;[08] INSTALLED R/H LOWER BULKHEAD SUPPORT AT BS 947 IAW SRM 51-40-02; DWG 149A8110 ID:0008 REV: A AND 149A8117 ID: 0006 REV: -;[09] VERIFIED FASTENER INSTALLATION;[10] VERIFIED CORRECTIVE ACTION 7; 8 AND MEASUREMENT TABLE

More about the Boeing 737-7H4