Service difficulty report · Support Strap · Boeing 7377H4

Difficulty date
July 6, 2022
Submitted
August 19, 2022
Operation
Air carrier
Aircraft
N202WN
Make and model
Boeing 7377H4
Aircraft serial
33999
Aircraft time
58,974 hours, 35,001 cycles
Part
Support Strap
Condition
Corroded
Location
Mid Cabin
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON SUPPORT STRAP AT MID CABIN ABOVE MLG WELL BS686 LBL68. MARKED / [01] REMOVED 2 FASTENERS IAW SRM 51-40-02-0G-0;[02] REMOVED CORROSION ON SUPPORT STRAP IN A 1'X1.5' AREA IAW SRM 51-10-02-0G-0. SRM DOES NOT HAVE LIMITS FOR SUPPORT STIFFNER/ANGLES ON CREASE BEAM WEB. ORIGINAL THICKNESS IS .071';[03] VERIFIED CORROSION REMOVAL AT REWORK AREA PER SRM 51-10-02-0G.;[04] HFEC INSPECTED BLENDED AREA IAW 737 NDTM PART 6 51-00-00 PROCEDURE 23.<BR>NO CRACKS NOTED.<BR><BR>HFEC INSPECTED OPEN HOLES IAW 737 NDTM PART 6 51-00-00 PROCEDURE 16. <BR>NO CRACKS NOTED.<BR><BR>UT INSPECTED BLENDED AREA IAW 737 NDTM PART 4 51-00-00 PROCEDURE 2.<BR>REMAINING MATERIAL THICKNESS IS 0.068' ADJACENT TO 0.071'.<BR><BR><BR>EQUIP USED:<BR>-NORTEC 600 ID: ATS2353 CAL DUE: 01/23<BR>-MINIMITE ID: IS000934 CAL DUE: 08/22<BR>-EPOCH 650 ID: ATS2031 CAL DUE: 03/23;[05] UPDATED CHART;[06] COMPLETED STEP 1.;[07] COMPLETED STEP 1;[08] VERIFIED MEASUREMENTS;[09] COMPLETE;[10] COMPLETED STEP 2;[11] COMPLETE;[12] CERTIFY;[13] VERIFIED STEP 2 COMPLETE. WORKSCOPE COMPLETED PER EA 22-153-02114

More about the Boeing 737-7H4