What was found
CORROSION ON FSD MOPSILL AT BS 312-315; 324; AND 333 RBL 59; WL 208 / [01] PARTIAL STEP 1-3.;[02] COMPLETED STEPS 1; 2 AND 3. VERIFIED CORROSION REMOVAL AND OUT OF LIMITS.;[03] REMOVED MOPSILL AT BS 260 TO BS 360 RBL 59 WL 208 IAW SRM 51-40-02-0G-0;[04] LOCATED AND DRILLED NEW MOPSILL AT BS 260 TO BS 360 RBL 59 WL 208 IAW SRM 51-40-05-0G-0 AND DWG 141A8310; OK TO INSTALL;[05] VERIFIED CORRECTIVE ACTION 4; OK TO INSTALL GIVEN.;[06] INSTALLED NEW MOPSILL FROM BS 260 TO BS 360 RBL 59 WL 208 IAW SRM 51-40-02-0G-0 AND DWG 141A8310; CARD IS COMPLETED;[07] VERIFIED MEASUREMENT TABLE.;[08] VERIFIED CORRECTIVE ACTION 6.;[09] VERIFIED TASK CARD COMPLETE.